
Medical Gas Installation
NFPA 99 certified medical gas systems for dental, medical, and surgical facilities across Oklahoma and Texas.
Precision Execution
Medical gas installation is a life-safety system requiring ASSE 6010 certified installers and strict adherence to NFPA 99. UDGOK's medical gas division installs, tests, and certifies complete piped gas systems for any size facility.
Discuss Your Project โWhat We Deliver
Oxygen Systems
Bulk oxygen supply, LOX systems, H-cylinder manifolds with automatic changeover and alarm panels.
Nitrous Oxide
N2O piping systems with zone valve boxes, WAGD (waste anesthetic gas disposal), and scavenging.
Medical Air
NFPA 99-compliant dental air or medical-grade air compressors with filtration and dew point monitoring.
Vacuum Systems
Wet and dry vacuum systems sized for procedure counts, including dental high-volume evacuation.
Alarm Systems
Master alarm panels, area alarm panels, and zone valve assemblies with NFPA-required features.
Testing & Certification
ASSE 6030 verifier testing, cross-connection testing, and third-party certification documentation.
The
Process
Our proprietary construction methodology eliminates surprises, protects your budget, and accelerates your opening date.
Discovery & Analysis
We comprehensively assess your clinical program, target real estate, zoning conditions, and specific regulatory requirements.
Design & Engineering
Our teams coordinate full construction documents with integrated real-time cost tracking to prevent ballooning budgets.
Construction Execution
Self-performed mechanical systems and rigorous site management ensure total quality control and adherence to schedule.
Commissioning & Turnover
We validate all medical systems, manage inspections, and fully orient your administrative staff to the new facility.
Start Your
Project
We provide accurate feasibility analysis and cost modeling before you sign a lease. Contact our project directors today.
